Instruktsii Dushevaia Kabina -

: The floor must be perfectly level and strong enough to support the weight of the cabin, the water, and the user. A clearance of at least 50 cm should be maintained on two sides for maintenance access, and 10–15 cm should remain between the cabin roof and the ceiling.

: Standard operation requires water pressure between 0.2 and 0.4 MPa (approx. 2–4 atmospheres). If pressure is too high, a pressure reducer is necessary; if too low, a pump must be installed. instruktsii dushevaia kabina

Proper preparation is the foundation of a durable installation. : The floor must be perfectly level and

Following a logical sequence prevents costly errors like leaks or structural instability. a pressure reducer is necessary